8–1200 kVA
Open frame genset
Bare engine-alternator on a steel skid with control panel. Lowest cost per kVA, ideal where a dedicated generator room already exists.
Open frame, silent canopy, containerized and trailer-mounted gensets built to your voltage and frequency. Yuchai, Weichai, Cummins and Perkins engines. One unit minimum, full export documentation, FOB / CIF to any port.
Same engine platform, different enclosure and mobility — pick the type that matches your site and budget.
8–1200 kVA
Bare engine-alternator on a steel skid with control panel. Lowest cost per kVA, ideal where a dedicated generator room already exists.
20–1200 kVA
Weatherproof acoustic canopy with integrated fuel tank, radiator and exhaust. The usual choice for hospitals, hotels and urban sites.
200–4000 kVA
Genset, switchgear, fuel system and fire detection inside one weatherproof acoustic canopy. ISO 20 ft / 40 ft container build available on request for data centres and utility projects.
20–500 kVA
Single or tandem axle trailer with brakes, lights and lifting eyes. Supplied with tow bar and optional road homologation for the destination country.
4× LED · in stock
Four-LED tower on a towable chassis with hydraulic mast, used with our gensets on mining and construction projects. Optional 4G remote start/stop, 0–100 % dimming and GPS.
EPC package
Base frame, exhaust run, intake/exhaust louvres, noise control, fuel piping, ATS and multi-set paralleling panels — quoted as one scope.
Diesel power on a chassis — pickup, truck, semi-trailer or medium-voltage unit. Four bands, four different constraints.
A 4,050 kg pickup cannot legally carry a 100 kW set — start from the rear-axle rating, not the kilowatts.
Read the band → 200–500 kW · medium & heavy truck Plates and licencesA yellow-plate unit needs a B2 licence and meets daytime city bans. One 500 kW set or 2×250 kW in parallel — decide before the body is built.
Read the band → 800–3000 kW · medium voltage 6.6/11 kV Cable mass decides itEight 240 mm² cores at low voltage become one 35 mm² core at 10.5 kV — that is why utilities move up a voltage level.
Read the band → 20–800 kW · trailer-mounted station No type approval neededA towed unit is not a motor vehicle: no conversion approval, no B2 licence, HS 8502 for export and the shortest lead time of the four.
Read the band →By sector: hospital standby 200–800 kW · data centre and UPS step load 1000–2000 kW · events and stadiums 200–1200 kW · emergency response 20–400 kW
Indicative configurations from our Liuzhou warehouse. Custom ratings, voltages and enclosures are built to order.
| Rating | Standby kVA | Engine | Typical application | Build | FOB from (USD) |
|---|---|---|---|---|---|
| 30 kW | 37.5 | Yuchai YC4FA75-D20 | Small site, farm, shop backup | Open / silent | 2,900 |
| 50 kW | 62.5 | Yuchai YC4D90Z-D20 | Residential block, retail | Silent | 4,200 |
| 80 kW | 100 | Weichai WP4D108E200 | Hotel, supermarket, small plant | Silent | 5,900 |
| 100 kW | 125 | Yuchai YC6B155-D20 | Clinic, school, office | Silent | 7,300 |
| 120 kW | 150 | Weichai WP6D167E200 | Workshop, plant room | Open | 6,900 |
| 200 kW | 250 | Yuchai YC6M350L-D20 | Factory standby, commercial | Silent | 11,500 |
| 200 kW | 250 | Cummins 6LTAA8.9-G2 + Leroy-Somer | Data centre, foreign-invested plant | Silent | 18,900 |
| 250 kW | 312.5 | Weichai WP10D320E200 | Parallel operation, industrial | Silent | 14,300 |
| 300 kW | 375 | Cummins NTA855-G4 | Mining, crusher plant, hot climate | Open / container | 23,500 |
| 400 kW | 500 | Cummins KTA19-G4 | Hospital-grade, data centre | Silent / container | 33,500 |
| 500 kW | 625 | Cummins KTA19-G8 | N+1 paralleling, industrial | Container | 40,500 |
| 800 kW | 1000 | Cummins KTA38-G5 | High-voltage output, utility | Container | 64,000 |
FOB from prices above are indicative USD anchors for standard configurations at 50 Hz, 400/230 V, 0.8 pf, valid for 30 days and excluding freight, insurance, duties and installation. Open-frame versions run about 8–12 % below the silent figure; 60 Hz builds, CE configuration, non-standard voltage, ATS, synchronising panels and spare-parts kits are quoted separately. The signed proforma invoice prevails.
Ratings above are standby (ESP) figures at 50 Hz, 400/230 V, 0.8 power factor. Prime (PRP) and continuous (COP) ratings, 60 Hz versions, and 1000–4000 kVA containerized units are quoted on request. Send the load list and we return a specification and firm price within 2 hours (working hours, GMT+8).
Five steps, no surprises — from load list to container on board.
Send kW, voltage, frequency, altitude, ambient temperature and duty (standby or prime).
We return a datasheet, outline drawing and FOB price within 2 working hours.
Proforma invoice with confirmed lead time; T/T deposit or L/C at sight.
Assembly, load-bank test, photo and video report before packing.
Export packing, booking, loading plan, then FOB/CFR/CIF documents by courier.
Open-frame and silent sets are packed in export plywood cases or strapped to steel skids with the fuel tank drained. Containerized units travel as a complete ISO container and can be stacked. Trailer units ship as a whole trailer, secured on flat rack or in a 40 ft high cube. We issue a loading plan with container utilisation and centre-of-gravity before booking, so the set arrives without transit damage.
Loading ports: Qinzhou and Fangchenggang (Guangxi), or Shenzhen / Guangzhou / Shanghai by arrangement. Air freight for spare parts and urgent single units.
What 25 years of quoting these sets teaches you — written for whoever signs the purchase order.
Indicative prices by rating, the component split behind them, and the seven variables that move a quote by 30 %.
Chassis and set pairing by power band, the six things a vehicle does to a genset, and who owns the type approval.
What the dB number actually promises at 7 m, why cooling and noise fight each other, and what to specify for a permit.
What ships inside the shell, which rating fits which container, and why paralleling must be decided before it is built.
Service scope at each interval, the failures that are not wear-related, and the four clauses that give a contract teeth.
The document set, three packing methods, container loading plans, and the three places importers commonly lose money.
What to verify before a deposit, how to tell a broker from a supplier in one email, and where we honestly sit in that picture.
ACFTA duty with Form E, five certification regimes, the 60 Hz Philippines exception, used-unit limits and why noise delays commissioning.
Straight answers — the same ones our engineers give on the phone.
One unit. We ship single sets to end users as well as multi-unit projects for distributors and EPC contractors.
Yes. 50 Hz and 60 Hz are both available, and output voltage is configured to the destination market — for example 380/220 V, 400/230 V, 415/240 V, 440/254 V or 480/277 V.
Yuchai, Weichai, Cummins and Perkins, matched with well-known alternators. For export projects we quote the engine brand that has spare-part support in the destination country.
CE-certified configurations are available on request for projects that require them. Please state the requirement in your inquiry so the quotation includes certification.
Commercial invoice, packing list, bill of lading, certificate of origin, factory test report, English operation and maintenance manual, and the wiring diagram. A fumigation certificate or third-party inspection report can be arranged.
Open-frame and silent sets ship in export plywood cases or on steel skids; containerized sets ship as a complete 20 ft or 40 ft container unit; trailer sets ship as a complete trailer. We supply the loading plan and container utilisation sheet before booking.
Stocked 30–1200 kW models are typically ready in 7–15 days; customized and larger sets usually take 25–45 days depending on configuration. The confirmed date is stated in the proforma invoice.
We provide remote commissioning support, English manuals and video guidance, plus spare parts supply by air. For larger projects we can arrange an engineer to attend site commissioning; terms are agreed in the contract.
T/T and irrevocable L/C at sight. FOB, CFR and CIF are all quoted; shipments usually leave from Qinzhou or Fangchenggang in Guangxi, or from Shenzhen / Guangzhou depending on the route.
A standard 100 kW (125 kVA) silent canopy set with Yuchai engine, 50 Hz, 400/230 V starts at about USD 7,300 FOB China. Entry-level 30 kW open-frame sets start at about USD 2,900, 200 kW silent sets at about USD 11,500, and 400 kW Cummins sets at about USD 33,500. Open-frame versions are roughly 8–12 % cheaper than silent. Prices exclude freight, insurance, duties and installation.
The model table shows indicative FOB China prices, valid for 30 days. CFR and CIF quotations are issued against the destination port and container plan, normally within 2 working hours of receiving the load list.
Yes, as an option. The 4G module gives remote lamp on/off, genset start-stop, 0–100 % dimming, scheduled switching by shift, and telemetry — fuel level, coolant temperature, battery voltage, GPS position — with low-fuel and movement alarms. If the network drops, the controller falls back to local manual or timer operation, so the tower keeps working. Units already delivered can be retrofitted.
Eight 9 m towable units per 40HQ, mast folded and chassis loaded crosswise — each unit takes about 1.5 m of container length across the 2.35 m width. Loaded lengthwise only 6–7 units fit, which is why a loading plan is issued with the quotation. 6 m and solar models load more per container because the chassis is shorter. Export is by full 40HQ for batch orders, or LCL for sample and single-unit orders.
Genset Butler
269 Liuyong Road, Liuzhou, Guangxi 545000, China
Tel / WhatsApp: +86 135 1772 8899
Email: [email protected]
Working hours: 08:30–22:00 GMT+8, seven days
Technical support: 24 hours
· 25 years in the diesel power trade — selection, installation and service done in-house, not outsourced.
· Published prices and selection formulas, so you can sanity-check our quotation.
· Load-test report and photo/video evidence before the container is sealed.
· English documentation and remote commissioning support as standard.
No registration, no sales sequence — just an engineer answering the specification.