Diesel generator export FAQ: lead time, payment, certification and spare parts

These are the ten questions buyers ask before placing a diesel generator order from China, answered as short facts you can quote rather than marketing copy. Every figure below reflects what we actually quote in 2026 — stock ratings, standard canopies and non-standard builds priced separately.

Quick answers

QuestionShort answer
Minimum order quantityOne unit. A sample order and a full-container order use the same price structure.
Lead time, stock ratings15–25 days from deposit receipt.
Lead time, non-standard30–45 days for container modules, non-standard voltage, 60 Hz builds and paralleling panels.
Payment terms30 % T/T with order, 70 % before shipment or against a copy of the bill of lading. L/C at sight accepted above USD 50,000.
IncotermsFOB, CFR and CIF quoted side by side once the destination port is named.
Container loading1–2 units per 40HQ or 40FR in the 20–500 kW range; above 800 kW expect flat rack or break bulk.
CertificationCE (incl. 2000/14/EC noise) for the EU, EPA Tier 4 Final for the US non-road market, SONCAP Nigeria, SASO/SABER Saudi Arabia, EAC Eurasian union.
PackingPlywood case as default up to about 300 kVA — ISPM 15 exempt, no fumigation needed, stackable two high.
Spare partsConsumables and filter kit in every shipment; fast movers by DHL in 48–72 hours to major hub cities.
Quote turnaroundTwo working hours (GMT+8) once we have the load list and destination port.

How long does a diesel generator order from China take?

15–25 days for stock ratings, 30–45 days for container modules, non-standard voltages or paralleling gear. Both counted from the date the deposit arrives, not from the date of the enquiry.

Two things move the number. First, whether the set needs a non-standard voltage or frequency — a 60 Hz build for the Philippines or parts of Latin America is a different alternator winding, not a setting. Second, whether it ships inside a container module, which adds enclosure fabrication after the set itself is built.

Add transit on top: about 7–12 days to Southeast Asian ports, 18–25 days to Middle East and East African ports, 28–35 days to West Africa and Latin America. Ask for a landed-date estimate rather than a shipping-date estimate — the two differ by the port congestion you cannot control.

What are the standard payment terms?

30/70 T/T is the market standard: 30 % to schedule production, 70 % before shipment or against a copy of the bill of lading. L/C at sight is accepted above USD 50,000.

Two clauses worth reading carefully before you sign an L/C:

How many generator sets fit in a container?

One or two units per 40HQ or 40FR in the 20–500 kW range. Above 800 kW, sets usually ship on flat racks or as break bulk. Volume, not weight, sets the limit.

RatingType20 GP40 HQ
30–50 kVAOpen frame9–1120–24
100 kVASilent canopy6–714–16
200 kVASilent canopy48–9
400 kVASilent canopy24–5
800 kVAContainer module (20 ft)1—

A silent canopy takes roughly 60 % more container space than the open version at the same rating. That is why the canopy looks expensive per unit on paper and cheap per container in practice — and why a mixed order of open and silent sets needs a loading plan before you commit to a container count.

Nine-metre towable lighting towers load eight per 40HQ with the masts folded and the chassis loaded crosswise. Above that, the mast length, not the tower count, becomes the constraint.

Which certification does each market require?

CE for the EU (including the 2000/14/EC noise directive, with a third-party test report), EPA Tier 4 Final for the US non-road market, SONCAP for Nigeria, SASO/SABER for Saudi Arabia, EAC for the Eurasian customs union.

MarketRequirementThe detail that catches buyers
European UnionCE marking, 2000/14/EC noiseA self-declaration is not a test report. Noise limits are measured at defined distances and the report must name the model.
United States (non-road)EPA Tier 4 FinalApplies per engine family. A Tier 3 engine cannot be re-labelled; the certificate is issued for a specific family and power band.
NigeriaSONCAPProduct certificate must be obtained before shipment; a Form M opened afterwards causes clearance delays.
Saudi ArabiaSASO / SABERRegistration is per product, and the certificate of conformity is issued per shipment through SABER.
Russia / EAEUEAC (TR CU 010/011)Requires a local applicant entity; the certificate is not transferable between importers.
Most of Africa, Middle East, SE AsiaNo mandatory scheme, ISO 8528 appliesISO 8528 governs performance and rating definitions — insist the test report references the relevant part.

Whatever the market, the certificate must map to the specific model and serial number you receive. A certificate for "diesel generating set, 200 kVA" with no model reference is worth very little at customs or at an insurance claim.

How are spare parts supplied after delivery?

Every shipment includes a consumables and filter kit with a parts list and illustrated catalogue. Fast-moving parts ship by DHL, typically 48–72 hours to major hub cities. Control faults are handled by remote diagnosis first.

The kit that matters is the one sized for the first service interval, not a token box of filters. Ask for the parts list by part number, and check that the numbers match the engine and alternator manuals you received — mismatched numbers are the most common reason a first service becomes a two-week wait.

For remote sites, the practical arrangement is a stocked kit for one year of running plus a named contact for diagnosis. Beyond that, the economics of air freight turn against you and a consolidated sea shipment is cheaper.

What must a warranty in writing actually say?

A written warranty must state three things: the term, who pays labour, and who pays freight on failed parts. A message saying "two years warranty" with no mention of labour or freight means the buyer owns both.

The industry baseline is twelve months from commissioning or 1000 running hours, whichever comes first, on manufacturing defects. Wear items — filters, belts, injectors, batteries — sit outside it, which is normal and worth confirming rather than assuming.

Repair work and the parts replaced during a repair carry a shorter warranty of their own, 3–6 months. If the same fault returns inside that window, the second attendance should not carry a fresh call-out charge. Put that sentence in the contract; it is the one clause that changes how a service agent behaves.

Can you build non-standard voltage, 60 Hz and paralleling?

Yes. 50/60 Hz, non-standard voltages (e.g. 380/220, 440/254, 480/277), synchronising panels and paralleling gear are quoted as non-standard builds with a 30–45 day lead time.

Three details to settle at enquiry stage, because they change the price materially:

Does plywood packing need fumigation?

No. Plywood cases fall outside ISPM 15. Solid wood packing must carry the ISPM 15 treatment mark, otherwise the container is refused entry or fumigated at the buyer's cost.

Other questions buyers ask

What is the minimum order — can I buy one set?

One unit, and it is priced on the same structure as a container order. What changes with volume is the freight per unit, not the price of the set. A single 200 kVA silent set shipped LCL is usually more expensive landed than the same set in a shared 40HQ, which is worth checking before you decide.

Who arranges shipping and insurance?

Under FOB you nominate the forwarder; under CFR we book and you insure; under CIF we book and insure at 110 % of invoice value, all risks. Carrier liability is limited by package weight, not by cargo value — a set that falls off a truck is not covered by the carrier's standard limit, so never rely on it.

What documents arrive with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, factory load test report carrying the set serial number, and — where applicable — the CE declaration of conformity or the destination-specific certificate of conformity. Ask for drafts before the vessel sails; correcting a bill of lading after departure costs amendment fees and delays release.

Can you supply a set rated for high altitude or high ambient?

Yes, with derating stated in the specification. Above 1000 m the engine loses roughly 3 % per additional 300 m unless the turbo match is changed; above 40 °C ambient the alternator must be rerated or the set uprated. Ask for the derating table, not just a confirmation that it "will work".

Do you support commissioning on site?

For orders where the value justifies it, yes — either our engineer travels or we appoint a partner in country and supervise remotely. Ask at quotation stage, because commissioning support needs to be in the contract and in the visa timeline, not added after the set has arrived.

How do I verify the factory before paying a deposit?

Ask for three things: a live video walk-through of the production line with the set you ordered visible mid-build, the load test report of a previous order for the same model (serial numbers visible), and two customer references in your region you can call. A supplier who cannot produce all three is a trading office, which is fine — but the price and the warranty should reflect it.

Send the load list and the destination port

You get FOB, CFR and CIF price lines, a container loading plan and a document checklist — within two working hours, GMT+8.

Request a quotation See price guide

Related: order, packing and shipping documents · price guide by rating · how to verify a supplier · containerized modules · silent canopy gensets · maintenance contracts · Southeast Asia requirements · all diesel generator sets 8–4000 kVA